48V/20Ah/Ebike Battery Pack for Electric Vehicle

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-11-30 22:03

  • Browse the number:

    59

Send an inquiries
+
Shenzhen BAK Energy Co. Ltd
Contactaixin:

Contactaixin:

szbak(Mr.)  

telephone:

Area:

Beijing

Address:

25th, BAK Technology Building, Keyan Rd 9, Nanshan High-Tech Park, Nanshan, Shenzhen, Guangdong, China (518000)

Website:

http://szbak.china-jiage.com/

+
Model Number: HBAK-48V 20AH Brand Name: HBAK Key Specifications/Special Features: Standard model:HBAK-36V 10Ah-A18650-2.2Ah-10S5PHBAK-24V 10Ah-A18650-2.2Ah-7S5P
  • HBAK-48V 10Ah-A
  • 18650-2.2Ah-13S5P
  • Nominal capacitytypical: 11Ah min: 10Ah
  • At 0.2C discharge
  • HBAK-36V 10Ah-A
  • Nominal voltage:36V
  • Maximum charge voltage:42V
  • Discharge cut-off voltage:28V
  • HBAK-24V10Ah-A
  • Nominal voltage: 24V
  • Maximum charge voltage:29.4V
  • Discharge cut-off voltage:19.6V
  • HBAK-48V10Ah-A
  • Nominal voltage: 48V
  • Maximum charge voltage:54.6V
  • Discharge cut-off voltage:36.4V
  • Charge current:5A maximum
  • Maximumcontinuous discharge current:10A
  • Maximumpulse discharge current (≤30s):30A (3 C)
  • Outer case material: aluminum andPVC front/end caps
  • Battery weight: <3.2kg
  • Internal resistance at 1000Hz:≤280MΩ
  • Cycle life: ≥500 cycles at 0.2C charge and0.2C discharge
  • Self-discharge rate (month)≤3%
  • Charging method (CC/CV)
  • Standard0.2Cx6.5 hours
  • Quick0.5 Cx3.5 hours
  • Operating temperature:
    • Charge: 0 to45°C
    • Discharge: -10 to60°C
  • Storages:
    • -20 to45°C with one month
    • 0 to35°Cwith 3 months
    • 15 to 25°Cwith 6 months
  • At 50% charged state, for long time storage, please charge and discharge the battery for 1-3 times every 3-6 weeks to avoid the battery to over-discharged
  • Shipping Information:
    • FOB Port: Shenzhen
    • Lead Time: 25 - 35 days
    Main Export Markets:
    • Eastern Europe
    • North America
    • Mid East/Africa
    • Central/South America
    • Asia
    • Western Europe
    • Australasia